コンテンツへスキップ ナビゲーションに移動

JASMA

  • Top
  • About Us
    • About JASMA
    • About RMA
    • About EMA
  • RVSM
    • About RVSM
    • RVSM Approvals
    • LHD
    • Minimum Monitoring Requirements
    • Monitoring Measures
  • HMU
    • Monitoring Process
    • HMU Status
    • Monitoring Request
    • Monitoring Result
  • RNAV/RNP PBCS
    • About RNAV/RNP
    • About PBCS
    • About PBHSM
    • RNAV/RNP PBCS Approvals
    • LLD/LLE
    • PBCS Monitoring
  • Wake Turbulence
    • About eWTS
    • Encounter Report
  • Documents
  • Links
    • RMAs/EMAs
    • JASMA Team
    • ICAO
  • Contact Us

PBCS Monitoring

  1. HOME
  2. RNAV/RNP PBCS
  3. PBCS Monitoring

Means for PBCS monitoring and assessment in the Fukuoka FIR has been established by the Japan Central Reporting Agency (CRA). If the Japan CRA determines that the actual performance of an aircraft dose not comply with the RCP/RSP specification, the JASMA notifies the operator of the monitoring result from the Japan CRA and recommends improvements in accordance with “Operating procedure for the horizontal safety assessment of the PBHSM airspace” .

Copyright © JASMA All Rights Reserved.

Powered by WordPress & Lightning Theme by Vektor,Inc. technology.

MENU
  • Top
  • About Us
    • About JASMA
    • About RMA
    • About EMA
  • RVSM
    • About RVSM
    • RVSM Approvals
    • LHD
    • Minimum Monitoring Requirements
    • Monitoring Measures
  • HMU
    • Monitoring Process
    • HMU Status
    • Monitoring Request
    • Monitoring Result
  • RNAV/RNP PBCS
    • About RNAV/RNP
    • About PBCS
    • About PBHSM
    • RNAV/RNP PBCS Approvals
    • LLD/LLE
    • PBCS Monitoring
  • Wake Turbulence
    • About eWTS
    • Encounter Report
  • Documents
  • Links
    • RMAs/EMAs
    • JASMA Team
    • ICAO
  • Contact Us
Translate »